EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
dfisher
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (72)
Research
Workshop
- (7)
-
Finished build table
-
Another build table
-
Found this
-
Building side workbench
-
More hangar setup
-
Hangar!
-
Things I Realize at...
Empennage
Fuselage
- (9)
Firewall
Tail Feathers
- (39)
Wings
- (17)
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
David Fisher
-
Project:
Team Mini-Max - Other
-
VIEW REPORTS
Total Hours:
252.3
Total Flight Time:
Total Expense:
$1238.85
Start/Last Date:
Dec 08, 2019 - Dec 08, 2019
Friendly URL:
https://eaabuilderslog.org?s=dfisher
Home or Last Project Picture
Aug 18, 2020
Hangar!
- (8 hours)
Category: Workshop
Well, a hangar became available on Aug 15 at Apex Airport so I jumped all over it as waitlists are 1.5-2+ years at area airports. So, existing 4' x 4' table had to be releveled and I built a second one and leveled it as well. Finally, I built two tables for belt sander and band saw.
IMG_20200817_225520250.jpg
IMG_20200818_172725225.jpg
IMG_20200818_172729095.jpg
IMG_20200818_172731574.jpg
IMG_20200818_173931727.jpg
IMG_20200818_173933274.jpg
IMG_20200818_173937702.jpg
IMG_20200818_180143056.jpg
IMG_20200818_203500368.jpg
IMG_20200818_203507017.jpg
IMG_20200819_195531896.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.